Skip to content

Projects

Know what phase a part is in without asking anyone.

Projects carry a part through the phases your shop defines. Required checklist items gate the move to the next phase, so progress reflects work done rather than a date on a plan.

SF-2001

Utility Cart, rev B

In dev
  1. Concept
  2. Design
  3. Prototype
  4. Pre-Prod
  5. Released
  • Concept1

  • Design1

  • Prototype2

  • Pre-Prod0

    No cards

  • Released1

Interactive preview with sample data and sample phases. Pick a card from any phase to load it into the header.

Progress you can defend

  • Phases gated by checklist

    You define the phases. Checklist items marked required must be checked before a project moves on to the next one.

  • Sign-offs on the record

    A phase can require sign-off, and the project keeps the record of who signed off and when.

  • The BOM and its files in one place

    A project's BOM is a tree you can cost, build and release, and every part in it holds its own drawings and files.

Bring one live project to the demo

Request a demo